This overpass project is located in the key part of Zhengzhou's "South Gate", which consists of the main line of Zhengzhou-Xinhua Expressway, Zhongzhou Highway and four ramps. In addition, the total investment of BT contract is 4729.9 million yuan, which has solved more than 30 export turning problems. It was once called "the most complex interchange in Zhengzhou". It connects Zhongzhou Avenue and Zhengxin Road in the north, Zhengxin Expressway in the South and the old 107 National Highway. Here is the East-West Xiangyang Road. In the past, these roads formed many intersections at the Shibali River turntable of Yutong. With the gathering of nearby steel market and logistics companies, buses often passed by and road congestion became normal.
After the overpass is opened to traffic, citizens can drive directly from Zhongzhou Avenue to the south through the second and third decks of Zhengzhou
Expressway and the old 107 National Highway; from south to north, through the second, third decks and four ramp bridges, respectively, from Zhengzhou
Expressway and the old 107 National Highway to the direction of Zhongzhou Avenue or Zhengxin Road.
Shenzhen Qinli photoelectric Co., Ltd.